20ft standardTools, household storage & smaller sites
A smaller footprint; leave extra space to open the doors.
Compare 20ft, 40ft, and high-cube storage containers, also called conex boxes. Check prices, local placement rules, and delivery to your address.
Used container price snapshots. Recorded Nov 6, 2026 from Shipped’s Los Angeles, CA page (nearest published market, 112 mi from Cathedral City). Check the supplier for today’s stock and price.
20ft standardA smaller footprint; leave extra space to open the doors.
40ft standardTwice the external floor area of a 20ft container.
40ft high cubeThe same footprint as a 40ft, with an extra foot of height.
Illustrative container photos, not units offered for sale. *External footprint; interior dimensions are smaller. Color, condition, and availability vary.
Give both suppliers the same size, condition, delivery address, and required date.
| Supplier | What to compare | Price & terms | Next step |
|---|---|---|---|
| SHIPPEDOur supplier notes ↗ | 20ft, 40ft & high cube Used grades and other configurations | Published city prices below. Delivery and taxes are additional. | Check Shipped prices |
| EVEONOur supplier notes ↗ | 20ft, 40ft & high cube Used containers; check one-trip options | Enter your ZIP for a comparable price and transport charge. | Check Eveon prices |
These are Shipped’s advertised unit prices, not delivered quotes or a lowest-price claim.
| Size | Wind & watertight | Cargo worthy | Delivery + tax |
|---|---|---|---|
| 20ft standard | $1,447 | $1,647 | Quoted for your address |
| 40ft standard | $1,747 | $1,897 | Quoted for your address |
| 40ft high cube | $1,827 | $1,977 | Quoted for your address |
Source: Shipped’s Los Angeles, CA price list · Checked Nov 6, 2026. Read Shipped’s grade definitions.
$300 more for twice the footprint. In this Los Angeles, CA snapshot, Shipped’s used 40ft WWT unit costs $300 more than its 20ft. Check the delivery difference and available unloading space before upsizing.
Storage for a project or a season. Compare the whole rental period, including delivery and collection. Availability is address-specific.
20ft standardA smaller footprint; leave extra space to open the doors.
40ft standardTwice the external floor area of a 20ft container.
40ft high cubeThe same footprint as a 40ft, with an extra foot of height.
Illustrative container photos, not units offered for sale. *External footprint; interior dimensions are smaller. Color, condition, and availability vary.
Give both suppliers the same size, condition, delivery address, and required date.
| Supplier | What to compare | Price & terms | Next step |
|---|---|---|---|
| SHIPPEDOur supplier notes ↗ | 20ft & 40ft storage rentals Confirm the exact size and condition | Get the monthly payment, minimum term, delivery and pickup together. | Check Shipped rentals |
| EVEONOur supplier notes ↗ | 20ft, 40ft & high cube Wind & watertight storage rentals | Published 3-month commitment. FAQ and rental terms differ on upfront payment and cancellation notice; confirm the agreement. | Check Eveon rentals |
Compare delivery, condition & supplier terms ↗
Rental terms: Eveon’s rental FAQ and rental agreement terms · Reviewed Nov 8, 2026. Confirm the current agreement before ordering.
Monthly payments toward ownership. Compare the complete agreement against buying. We cover one rent-to-own supplier; this is not a whole-market comparison.
20ft standardA smaller footprint; leave extra space to open the doors.
40ft standardTwice the external floor area of a 20ft container.
Illustrative container photos, not units offered for sale. *External footprint; interior dimensions are smaller. Color, condition, and availability vary.
Compare Shipped’s ownership agreement with an outright purchase using the same size, condition, and delivery address.
| Supplier | What to compare | Price & terms | Next step |
|---|---|---|---|
| SHIPPEDOur supplier notes ↗ | Used 20ft & 40ft plans Confirm title-transfer terms | Get the full payment count, total cost, upfront fees and early-buyout amount. | View Shipped terms |
Yardbox is an independent comparison guide, not a container seller. Supplier links open their websites. How these links work ↗
Build a purchase budget from an advertised container price. Add the charges from your quotes. A blank amount stays unknown; enter $0 only when a cost does not apply.
Starting prices: Shipped’s Cathedral City list ↗, checked Nov 6, 2026. No contact details are collected or sent. Compare all city price snapshots ↗
In Cathedral City, a storage or shipping container is not a drop-and-go item. Today's code allows one only with a special use or conditional use permit, on a concrete pad, finished to match the main building. A new Development Code takes effect January 11, 2027 and rewrites those limits by zone and purpose.
The adopted Development Code (§9.90.050) lists cargo and shipping containers by name. Construction containers may stay up to 12 months, and other temporary containers up to 60 days in commercial and industrial districts, both with a Special Use Permit. Containers kept longer than 12 months need a Minor Use Permit, must be fully screened and are limited to commercial and industrial districts. If your rental will run past January 11, 2027, ask which rules will govern it. [4] [3]
These rules apply only inside Cathedral City limits. A Cathedral City mailing address or ZIP code does not prove the parcel is in the city, since land at the edges may fall under a neighboring city or Riverside County. Check the city's zoning map or GeoHub for your parcel. The city's FAQ notes that a specific plan can replace or add to normal zoning standards, so ask whether one covers your property. [11] [9] [1]
Today, §9.80.130 does not limit storage containers to certain zones, but it requires a use permit, a concrete pad and colors that match the house. From January 11, 2027, the new section sets a 60-day temporary allowance for non-construction containers only in commercial and industrial districts. It gives no matching residential path. Next step: Before you rent, ask Planning whether a residential container is permittable for your dates and what pad and finish conditions apply. [1] [3] [8]
The current special use permit chapter covers temporary storage yards for projects under construction, and those permits can be extended for the life of the project. From January 11, 2027, construction-related containers may stay up to 12 months with a Special Use Permit. They must be 5 feet from parcel lines and removed before the permit expires. Containers must also meet the Building Code and may need a building permit. Next step: Apply with your project's permit number, a plot map and a removal date, and ask whether a building permit is also needed for the box. [2] [3] [5]
Outdoor storage in commercial zones must sit in areas approved through design review, behind view-obscuring walls or fences. Under the new code, a container staying more than 12 months is treated as permanent. It needs a Minor Use Permit, full screening and a commercial or industrial district. Next step: Have Planning confirm the zoning, screening and permit type before you sign a long rental. [7] [3] [9]
Chapter 14.16 says you need a permit before placing or leaving any obstruction in a public right-of-way. The application must show the exact location, dimensions, duration and purpose, and the permittee takes on liability for damage. Engineering issues public encroachment permits. Unpermitted encroachment is a public nuisance. Next step: Contact Engineering at (760) 770-0350 before choosing a curbside spot, and show the full container and truck footprint. [6] [10]
A standard rental box can clash with these rules. Cathedral City wants matching exterior colors, and Shipped's rental terms forbid modifying the container, including painting. Shipped and Eveon both have a three-month minimum. Get the city's permit conditions in writing first, then confirm the supplier can meet them and collect before your permit ends.
Use the zoning map or GeoHub to check city limits and the zoning district, and ask whether a specific plan applies. Zoning matters even more after January 11, 2027, when the 60-day non-construction allowance is limited to commercial and industrial districts. [11] [9] [3]
Cathedral City zoning map and GeoHubCall Planning at 760-770-0340 or email [email protected] with your dates, the box size, a site sketch and the purpose. Applications are submitted only through the Citizen Self-Service Portal. A complete special use permit application gets a decision within ten working days, and the new code asks for temporary use applications 30 days ahead. [8] [2] [5]
Cathedral City Planning and permit portalTell the supplier about the concrete pad, the finish requirement, the 5-foot setback and the removal date. Confirm the minimum rent, pickup notice and whether any painting or modification is allowed. [12] [13] [14] [1]
Read Shipped's published rental qualifications“I’m considering a container placement in Cathedral City at [address / parcel]. It is [size], for [use], for [duration], in the location on this sketch. Which zoning, building, and street-use approvals apply?”
This guide identifies questions and official resources. The responsible authority must confirm the requirements for your project.Show the gate, tight turns, overhead obstructions, ground surface, and final door direction. Ask for approval of the full route before setting a delivery date.
Planning figures from Shipped’s delivery guidelines. These are supplier-specific; your dispatcher must confirm the truck and site.
Yes. Under §9.80.130, storage containers may be allowed by a special use permit or a conditional use permit, depending on how long the container will be used. The new Development Code, effective January 11, 2027, keeps the permit requirement: Special Use Permits for temporary containers, and a Minor Use Permit for anything over 12 months. [1] [3]
Only with a permit, and today it must sit on a concrete pad with colors and materials similar to your house. From January 11, 2027, the new 60-day allowance for non-construction containers covers only commercial and industrial districts, so ask Planning first. [1] [3] [8]
From January 11, 2027, a construction-related temporary container may be permitted for up to 12 months with a Special Use Permit. Before then, temporary construction storage yards can get a special use permit that may be extended for the project's duration. [3] [2]
Not without a permit. Chapter 14.16 requires a permit before placing any obstruction in a public right-of-way, and Engineering issues public encroachment permits. Your application must show the exact location, size, duration and purpose. [6] [10]
Not necessarily. Shipped and Eveon publish three-month minimums, but under the new code non-construction temporary containers get at most 60 days, in commercial and industrial districts. Containers must be removed before the permit expires, so check the pickup terms first. [12] [13] [3]
Shipped’s published Nov 6, 2026 snapshot for Los Angeles, CA, the nearest market with a published price list, lists a used 20ft wind-and-watertight container at $1,447 and a used 40ft standard at $1,747. These are container-only advertised prices. Request a current quote with the delivery address, tax, condition, and all fees. Check the source price list and compare Eveon using the same specification.
No. Yardbox is a comparison guide. We do not own a depot or hold inventory. Ask the supplier for the actual transport origin, current stock, and whether customer pickup is possible. A city listing does not establish a pickup address.
Compare the supplier’s written condition definitions and remedy, not only the abbreviation. Ask for floor, roof, door-seal, and interior photos or inspection details. If the container will carry freight, confirm the required certification separately. See Shipped’s grade descriptions or read our used-container checklist.
Reviewed Nov 8, 2026. We prioritize official planning, transportation, and code resources. Supplier facts are attributed separately; we have not inspected local inventory.
Browse all city prices or compare supplier terms before requesting a quote.