Start at the road, not the pad
Walk the route a delivery truck would take from the public road to your intended position. Note gate openings, tight turns, overhead obstacles, soft ground, slopes, and any place the driver cannot turn around. Share photos and measurements with the supplier before paying.
Measure the unloading run
Delivery methods vary. As one supplier-specific example, Shipped’s guidance calls for at least 60 feet of straight-line space for a 20-foot delivery and 100 feet for a 40-foot delivery. Those are not universal promises that your site will work. The dispatcher must approve the actual approach and equipment.
Check above and below
Shipped’s guidance also describes roughly 14 feet of travel clearance and up to 20 feet of overhead clearance for unloading. Power lines, branches, buried infrastructure, and wet surfaces deserve attention. Do not attempt to move wires or guide a truck near utilities yourself. Ask the supplier what clearance and ground conditions it requires.
Agree on the details
Confirm the doors’ final orientation, who prepares the base, what access must remain clear, and what happens if weather or site conditions prevent unloading. A failed delivery can be costly even when the container never leaves the truck.
Your delivery prep list
0 of 6 checked
Checks are saved only in this browser. They do not certify your site or replace supplier approval.
Shipped delivery guidelines ↗
Supplier information reviewed November 6, 2026. Confirm current terms before ordering.